[1]武力 屈福政 孙伟等.基于离散元的土压平衡盾构密封舱压力分析.岩土工程学报,2009,28(5):553-557.
[2]亢晨钢[1],李守巨[1],刘迎曦[1].EPB盾构机土仓压力分布有限元数值模拟[J].工程建设,2009,41(4):1-6.
[3]Branque D, Doan V H, Boutin C. Earth Pressure Balanced Shield Method: Experimental Study on a Large Reduced Scale Model[C]//Proceedings of the 6th International Conference on Physical Modeling in Geotechnics. Hong Kong, 2006: 1145-1150 .
[4]王洪新[1,2],傅德明[2].土压平衡盾构平衡控制理论及试验研究[J].土木工程学报,2007,40(5):61-68.
[5]朱合华[1,2],徐前卫[1],廖少明[1],傅德明[3],于宁[1].土压平衡盾构法施工参数的模型试验研究[J].岩土工程学报,2006,28(5):553-557.
[6]胡国良[1],胡爱闽[1],龚国芳[2],杨华勇[2].土压平衡盾构地层适应性设计理论和方法研究[J].中国机械工程,2008,19(16):1916-1919.
[7]赵强政.φ520mm土压平衡式模型盾构机研制及试验性掘进控制模拟[D].西南交通大学,2007:
[8]Raffaele V, Claudio O, Daniele P. Soil Cbnditioning of Sand for EPB Applications: a Laboratory Research [J]. Tunnelling and Underground Space Technology, 2008,23 : 308-317.
[9]Merritt A, Mair R J. Mechanics of Tunnelling Machine Screw Conveyor: Model Tests[J]. Geotechnique,2006,56(9) : 605-615.
[10]Bezuijen A, Schaminee P E L. Simulation of the EPB--shield TBM in Model Tests with Foam as Additive[C]//Proceedings of Congress on Modern Tunnelling Science and Technology. "Rotterdam, 2001:935-940.
[11]龚国芳[1],胡国良[2],杨华勇[1].盾构推进液压系统控制分析[J].中国机械工程,2007,18(12):1391-1395.
[12]管会生[1,2],高波[1].盾构刀盘扭矩估算的理论模型[J].西南交通大学学报,2008,43(2):213-217.
[13]邢彤[1,2],龚国芳[1],杨华勇[1].盾构刀盘驱动扭矩计算模型及实验研究[J].浙江大学学报:工学版,2009(10):1794-1800.
[14]于颖[1],徐宝富[1],奚鹰[1],宋木生[1].软土地基土压平衡盾构切削刀盘扭矩的计算[J].中国工程机械学报,2004(3):314-318. |