[1]宋华明,韩玉启.混合装配线上物料供应的平准化排序[J].系统工程,2002,20(3):15-19.
[2]王炳刚[1],饶运清[1],邵新宇[1],徐迟[1].基于多目标遗传算法的混流加工/装配系统排序问题研究[J].中国机械工程,2009(12):1434-1438.
[3]耿娜[1],江志斌[1].用于晶圆制造产能规划优化决策的改进随机规划方法[J].上海交通大学学报,2007,41(5):825-829.
[4]Kai H, Shabbir A. A Stochastic Programming Approach for Planning Horizons of Infinite HorizonCapacity Planning Problems[Jl. European Journal of Operational Research, 2010, 200 : 74-84.
[5]Kingsman B G. Modeling Input-output Workload Control for Dynamic Capacity Planning in Production Planning Systerns[J]. International Journal of Production Economics, 2000,68:73-93.
[6]Leachman R C, Carmon T F. On Capacity Model ing for Production Planning with Alternative Machines[J]. IIE Transactions, 1992, 24(4):62-72.
[7]Ceryan O, Koren Y. Manufacturing Capacity Planningstrategies [J]. CIRP Annals - Manufacturing Technology, 2009, 58(1) :403-406.
[8]Barrat A, Barthelemy M, Pastor-Satorras R, et al. The Architecture of Complex Weighted Networks[J]. Applied Physical Science, 2004, 101 (11) :3747-3752.
[9]孙惠斌[1,2],江平宇[1,2].基于复杂加权网络的移动协同空间分析[J].西安交通大学学报,2006,40(5):573-576.
[10]王哈力[1],单薏[1],王希凤[1].组合逻辑电路的小世界网络模型[J].电机与控制学报,2006,10(4):370-374.
[11]Watts D J, Strogatz S H. Collective Dynamics of 'Small- World' Networks[J]. Nature, 1998, 393: 440-442.
[12]Tu Y H. How Robust is the Internet? [J]. Nature, 2000, 406:353-354.
[13]Tang D B, Zheng L, Li Z Z, et al. Re-engineer ing of the Design Process for Concurrent Engineering[J]. Computers&Industrial Engineering, 2000, 38:479-491.
[14]刘新华[1],张旭堂[1],刘文剑[1].基于改进最大-最小蚂蚁系统的多工艺路线决策方法[J].计算机集成制造系统,2008,14(12):2414-2420.
[15]汪小帆,李翔,陈关荣编著.复杂网络理论及其应用[M],2006:260.
[16]国家机械工业局.JBJ/T2-2000机械工厂年时基数设计标准[S].北京:机械工业出版社,2008.
[17]Barrat A, Barthflemy M, Vespignani A. Modeling the Evolution of Weighted Networks [J]. Physical Review E, 2004, 70(6):066149. |