[1]Van S,Demeulemeester L,Herroelen W. A Classification of Predictive-reactive Project Scheduling Procedures[J]. Journal of Scheduling, 2007, 10(3): 195-207.
[2]陈庭贵,琚春华.多干扰的资源约束项目调度问题[J].计算机集成制造系统,2012,18(11):2409-2418.
Chen Tinggui,Ju Chunhua.Resource-constrained Project Scheduling Problem with Multi-factor Disruptions[J].Computer Integrated Manufacturing System,2012,18(11):2409-2418.
[3]Herroelen W,Leus R.Robust and Reactive Project Scheduling: a Review and Classification of Procedures[J].International Journal of Production Research,2004,42(8):1599-1620.
[4]Novas M, Henning P. Reactive Scheduling Framework Based on Domain Knowledge and Constraint Programming[J]. Computers & Chemical Engineering, 2010, 34(12): 2129-2148.
[5]Xia Y, Chen B, Yue J. Job Sequencing and Due Date Assignment in a Single Machine Shop with Uncertain Processing Times[J]. European Journal of Operational Research, 2008, 184(1): 63-75.
[6]李平,顾幸生.不确定条件下不同交货期窗口的JobShop调度[J].管理科学学报,2004,2:22-26.
Li Ping, Gu Xingsheng. Job Shop Scheduling with Uncertain Processing Time and Distinct Due Windows[J]. Journal of Management Sciences in China, 2004,7(2): 22-26.
[7]Zhang M. Two-stage Minimax Regret Robust Uncapacitated Lot-sizing Problems with Demand Uncertainty[J]. Operations Research Letters, 2011, 39(5): 342-345.
[8]鲁建厦,施锦峰,李修琳,等.一类已知概率分布下的混合车间鲁棒调度问题研究[J].中国机械工程,2010,21(19):2328-2333.
Lu Jianxia, Shi Jingfeng, Li Xiuling, et al. Study on Hybrid Shop Robust Scheduling Problem with Known Probability Distribution[J]. China Mechanical Engineering, 2010, 21(19): 2328-2333.
[9]Ponsich A, Bonfill A, Espua A, et al. Genetic Algorithms for the Scheduling of Multiproduct Batch Plants within Uncertain Environment[J]. Computer Aided Chemical Engineering, 2007, 24: 619-624.
[10]Hufner M, Tometzki T, Engell S. Two-layer Planning and Scheduling of Batch Production Processes under Uncertainty[J]. Computer Aided Chemical Engineering, 2009, 27: 1197-1202.
[11]Jensen T.Robust and Flexible Scheduling with Evolutionary Computation[D].Arhus:University of Arhus,2001.
[12]Rahmani D, Heydari M. Robust and Stable Flow Shop Scheduling with Unexpected Arrivals of New Jobs and Uncertain Processing Times[J]. Journal of Manufacturing Systems, 2013. |