[1]Kanai S, Takahashi H, Makino H. Computer-aided Assembly Sequence Planning and Evaluation System Based on Predetermined Time Standard[J]. CIRP Annals-Manufacturing Technology, 1996, 45(1): 35-39.
[2]Eftekharian A A, Poladi R, Campbell M I. Evaluation and Search of Assembly Sequences in Large Systems[C]//ASME 2013 International Design Engineering Technical Conferences and Computers and Information in Engineering Conference. Portland, OR, United states, 2013: V02AT02A041.
[3]Zhang J Y, Zhao L N, Hao Y P, et al. Evaluation on Parallel Assembly Sequence[J]. Advanced Materials Research, 2013, 734: 2757-2760.
[4]张嘉易, 王成恩, 马明旭, 等. 产品装配序列评价方法建模[J]. 机械工程学报, 2009, 45(11): 218-224.
Zhang Jiayi, Wang Cheng’en, Ma Mingxu, et al. Modeling of the Method of Product Assembly Sequence Evaluation[J]. Journal of Mechanical Engineering, 2009, 45(11): 218-224.
[5]李磊, 魏生民, 张军波. 装配序列的模糊综合评价[J]. 中国机械工程, 2003, 14(18): 1606-1609.
Li Lei, Wei Shengmin, Zhang Junbo. Fuzzy Comprehensive Evaluation of Assembly Sequence[J]. China Mechanical Engineering, 2003, 14(18): 1606-1609.
[6]Husain A, Khan A A, Hasan F. Ergonomic Evaluation of Effects of Handle Shape and Task Orientation on Human Performance in Screw Driving Task[J]. International Journal of Advancements in Technology, 2013, 4(1): 105-114.
[7]张晓冬,杨育,易树平,等. 制造系统人因仿真参考模型及若干关键技术[J]. 机械工程学报,2006,42(3):56-63.
Zhang Xiaodong, Yang Yu, Yi Shuping, et al. Reference Model and Key Technology for Human Factors Simulation Manufacturing System[J].Journal of Mechanical Engineering,2006,42(3):56-63.
[8]Rao, G, Feng F, Si A, et al. Method for Optimal Determination of Parameters in Permutation Entropy Algorithm[J]. Journal of Vibration and Shock, 2014,33(1):188-193.
[9]Nieto-Morote A, Ruz-Vila F. A Fuzzy Approach to Construction Project Risk Assessment[J]. International Journal of Project Management, 2011, 29(2): 220-231.
[10]Ruoning X, Xiaoyan Z. Fuzzy Logarithmic Least Squares Ranking Method in Analytic Hierarchy Process[J]. Fuzzy Sets and Systems, 1996, 77(2): 175-190.
[11]Krohling R A, Campanharo V C. Fuzzy TOPSIS for Group Decision Making: a Case Study for Accidents with Oil Spill in the Sea[J]. Expert Systems with Applications, 2011, 38(4): 4190-4197.
|