[1]宋文学,石毅.数控机床运行状态远程监测和故障诊断系统实现[J].微电机,2010,43(5):100-102.
SONG Wenxue, SHI Yi.Research on Remote Monitoring and Fault Diagnosis System Realization Methods for CNC Machine Tool[J]. Micromotors, 2010,43(5):100-102.
[2]王庆锋,高金吉.过程工业动态的以可靠性为中心的维修研究及应用[J].机械工程学报,2012,48(8):135-143.
WANG Qingfeng, GAO Jinji.Research and Application of Dynamic Reliability Centered Maintenance for Process Industry[J]. Journal of Mechanical Engineering, 2012,48(8):135-143.
[3]DAI Y,ZHOU Y F,JIA Y Z.Distribution of Time between Failures of Machining Center Based on Type I Censored Data[J].Reliability Engineering and System Safety,2003,79(3):377-379.
[4]朱德馨,刘宏昭.基于改进的模糊层次分析法的电主轴可靠性分配[J].中国机械工程,2011,22(24):2923-2927.
ZHU Dexin, LIU Hongzhao. Reliability Allocation of High Speed Motorized Spindle Based on Improved Fuzzy AHP Method[J]. China Mechanical Engineering,2011,22(24):2923-2927.
[5]JIA Y Z,JIA Z X.Fatigue Load and Reliability Design of Machine Tool Component[J].International Journal of Fatigue,1993,15(1):47-52.
[6]黄强,张根保. 基于几何误差源互补偿的机床公差设计及其应用[J].中国机械工程,2010,21(5):580-584.
HUANG Qiang, ZHANG Genbao.Tolerance Design and Application for Machine Tool Based on Geometry Error Source Compensation Each Other[J]. China Mechanical Engineering,2010,21(5):580-584.
[7]WANG Y Q, YAM R C M,ZUO M J, et al. A Comprehensive Reliability Allocation Method for Design of CNC Lathes[J]. Reliability Engineering and System Safety,2001,72(3):247-252.
[8]杨兆军, 陈传海, 陈菲,等. 数控机床可靠性技术的研究进展[J]. 机械工程学报, 2013, 49(20): 130-139.
YANG Zhaojun, CHEN Chuanhai, CHEN Fei,et al. Progress in the Research of Reliability Technology of Machine Tools[J]. Journal of Mechanical Engineering, 2013, 49(20): 130-139.
[9]AZADEH A, GHADERI S F, ADABAD M F. Multi-criteria Quality Assessment of Products by Integrated DEA-PCA Approach[J]. International Journal of Reliability, Quality and Safety Engineering, 2007, 14(3):201-208.
[10]SHARY S P. A New Technique in Systems Analysis under Interval Uncertainty and Ambiguity[J]. Reliable Computing, 2002, 8(5): 321-418.
[11]张英芝, 贾亚洲, 张学文, 等. 数控冲床的故障概率分布模型[J].吉林大学学报(工学版),2004,34(2):264-267.
ZHANG Yingzhi, JIA Yazhou, ZHANG Xuewen. Model of Failure Probability Distribution for Numerical Control Punch[J]. Journal of Jilin University of Technology(Natural Science Edition),2004,34(2):264-267.
[12]ERIKSSON A, NORDMARK A. Non-unique Response of Mooney-Rivlin Model in Bi-axial Membrane Stress[J]. Computers & Structures, 2014,144(C): 12-22.
[13]李冬英. 数控机床装配质量建模与诊断技术研究[D]. 重庆:重庆大学,2014.
LI Dongying.Research on Quality Modeling and Diagnosis Technology for the Assembly Process of CNC Machine Tools[D]. Chongqing: Chongqing University,2014.
[14]RAN Y, ZHANG G B, ZHANG L. Quality Characteristic Association Analysis of Computer Numerical Control Machine Tool Based on Meta-action Assembly Unit [J]. Advances in Mechanical Engineering, 2016, 8(1): 1-10.
[15]张根保,王新,冉琰,等.复杂机电产品基于元动作分解的可靠性建模及故障诊断[J].重庆大学学报,2017,40(8):9-18.
ZHANG Genbao, WANG Xin, RAN Yan, et al. Reliability Modeling and Fault Diagnosis of Complicated Electromechanical Product Based on Meta-action Decomposition[J]. Journal of Chongqing University, 2017,40 (8): 9-18.
[16]刘英,孙云艳,张根保,冉琰.元动作装配单元误差传递模型及有效路径求解方法[J].重庆大学学报,2017,40(3):1-11.
LIU Ying, SUN Yunyan, ZHANG Genbao, et al. Error Propagation Model of Element Assembly Unit and Method of Solving Effective Path [J].Journal of Chongqing University, 2017,40 (3): 1-11.
[17]范剑青, 姚琦伟. 非线性时间序列:建模、预报及应用[M]. 北京: 高等教育出版社, 2005:53-59.
FAN Jianqing, YAO Qiwei. Nonlinear Time Series:Modeling, Prediction and Applications[M]. Beijing: Higher Education Press, 2005:53-59.
[18]POLAT K, GNE塁 S, ARSLAN A. A Cascade Learning System for Classification of Diabetes Disease: Generalized Discriminant Analysis and Least Square Support Vector Machine[J].Expert Systems with Applications, 2008,34(1):482-487. |