[1] 国际钢铁协会.世界钢铁统计数据[EB/OL].[2019-03-01]. https://www.worldsteel.org/zh/steel-by-topic/statistics/steel-statistical-yearbook/World-Steel-in-Figures.html. World Steel Association. World Steel Statistics[EB/OL].[2019-03-01].https://www.worldsteel.org/zh/steel-by-topic/statistics/steel-statistical-yearbook/World-Steel-in-Figures.html.
[2] 国外钢铁业绿色节能效果窥探[EB/OL].[2019-03-01]. http://news.bjx.com.cn/html/20140415/503821.shtml. Green Energy-saving Effect of Steel Industry Abroad[EB/OL].[2019-03-01]. http://news.bjx.com.cn/html/20140415/503821.shtml.
[3] GAO L, HUANG J D. An Effective Cellular Particle Swarm Optimization for Parameters Optimization of a Multi-pass Milling Process[J]. Applied Soft Computing, 2012, 12(11):3490-3499.
[4] PARK H S, TRAN N H. Development of a Smart Machining System Using Self-optimizing Control[J]. The International Journal of Advanced Manufacturing Technology, 2014, 74(9/12):1365-1380.
[5] 马峰, 张华, 曹华军. 面向低能耗少切削液的多目标加工参数优化[J]. 机械工程学报, 2017, 53(11):157-163. MA Feng, ZHANG Hua, CAO Huajun. Optimization of Multi-objective Machining Parameters for Low Energy Consumption and Less Cutting Fluid[J]. Journal of Mechanical Engineering, 2017, 53(11):157-163.
[6] POURSINA M, DEHKORDI N T, FATTAHI A, et al. Application of Genetic Algorithms to Optimization of Rolling Schedules Based on Damage Mechanics[J]. Simulation Modeling Practice and Theory, 2012(22):61-73.
[7] 唐立新.基于智能优化的钢铁生产计划与调度研究[J].管理学报,2005(3):263-267. TANG Lixin. Study on Steel Production Planning and Scheduling Based on Intelligent Optimization[J].Chinese Journal of Management,2005(3):263-267.
[8] TANG L, LIU J, RONG A, et al. An Effective Heuristic Algorithm to Minimise Stack Shuffles in Selecting Steel Slabs from the Slab Yard for Heating and Rolling[J]. Journal of the Operational Research Society, 2001, 52(10):1091-1097.
[9] WANG L, GAO X, WANG W. Dynamic Scheduling Method Based on Multi-agent for Cold Rolling Whole Line[C]//Proceedings of the 32nd Chinese Control Conference. Xi'an, 2013:8082-8087.
[10] VERDEJO V V, ALARCO M A P, SORLI M P L. Scheduling in a Continuous Galvanizing Line[J]. Computers & Operations Research, 2009, 36(1):280-296.
[11] 王秉铨,姜生远,王秋. 工业炉设计手册[M]. 北京:机械工业出版社,2011. WANG Bingquan, JIANG Shengyuan, WANG Qiu. Industrial Furnace Design Handbook[M]. Beijing:Mechanical Industry Press, 2011.
[12] 张多蒙. 基于改进量子遗传算法的微电网电源经济性优化配置研究[D].沈阳:沈阳工程学院,2017. ZHANG Duomeng. Research on Optimization and Configuration of Power Grid Economics Based on Improved Quantum Genetic Algorithm[D]. Shenyang:Shenyang Institute of Technology, 2017.
[13] 符杨,蒋一鎏,李振坤.基于混合量子遗传算法的微电网电源优化配置[J].电力系统保护与控制,2013,41(24):50-57. FU Yang, JIANG Yiliu, LI Zhenkun. Optimization Configuration of Microgrid Power Supply Based on Hybrid Quantum Genetic Algorithm[J].Power System Protection and Control,2013,41(24):50-57.
[14] KANT G, SANGWAN K S. Prediction and Optimization of Machining Parameters for Minimizing Power Consumption and Surface Roughness in Machining[J]. Journal of Cleaner Production, 2014, 83:151-164.
[15] 李修倩,冯好娣. 最小化完成时间和加惩罚值和的批调度问题[J].计算机研究与发展,2013,50(8):1700-1705. LI Xiuqian, FENG Haodi. The Problem of Batch Scheduling with Minimum Completion Time and Penalty Value[J]. Computer Research and Development, 2013, 50(8):1700-1705. |