[1]ROODBERGEN K J, VIS I F A. A Survey of Literature on Automated Storage and Retrieval Systems[J]. European Journal of Operational Research, 2009, 194(2):343-362.
[2]ROUWENHORSTA B, REUTERB B, STOCKRAHMB V, et al. Warehouse Design and Control:Framework and Literature Review[J]. European Journal of Operational Research, 2000, 122(3):515-533.
[3]SARKER B R, BABU P S. Travel Time Models in Automated Storage/Retrieval Systems:a Critical Review[J]. International Journal of Production Economics, 1995, 40(2/3):173-184.
[4]GAGLIARDI J P, RENAUD J, RUIZ A. Models for Automated Storage and Retrieval Systems:a Literature Review[J]. International Journal of Production Research, 2012, 50(24):7110-7125.
[5]LERHER T, SRAML M, KRAMBERGER J,et al. Analytical Travel Time Models for Multi Aisle Automated Storage and Retrieval Systems[J]. The International Journal of Advanced Manufacturing Technology, 2006, 30(3/4):340-356.
[6]GU J X, GOETSCHALCKX M, MCGINNIS L F. Resarch on Warehouse Design and Performance Evaluation:a Comprehensive Review[J]. European Journal of Operational Research, 2010, 203(3):539-549.
[7]秦叙斌.有轨巷道堆垛起重机入出库能力的计算[J]. 起重运输机械, 2001(11):9-11.
QIN Xubin. Calculation of Productivity of Automated Storage/Retrieval Machine[J]. Hoisting and Conveying Machinery, 2001(11):9-11.
[8]LERHER T, SRAML M, POTRC I. Simulation Analysis of Mini-load Multi-shuttle Automated Storage and Retrieval Systems[J]. The International Journal of Advanced Manufacturing Technology, 2011, 54(1):337-348.
[9]AZZI A, BATTINI D, FACCIO M, et al. Innovative Travel Time Model for Dual-shuttle Automated Storage/Retrieval Systems[J]. Computers & Industrial Engineering, 2011, 61(3):600-607.
[10]MELLER R D, MUNGWATTANA A. Multi-shuttle Automated Storage/Retrieval Systems[J]. IIE Transactions,1997,29(10):925-938.
[11]MELLER R.D MUNGWATTANA A. AS/RS Dwell-point Strategy Selection at High System Utilization:a Simulation Study to Investigate the Magnitude of the Benefit[J]. International Journal of Production Research, 2005, 43(24):5217-5227.
[12]宋宇博, 蒋兆远, 孙秉珍. 多端口出入式自动化存取系统作业集成优化[J]. 中南大学学报(自然科学版), 2016, 51(6):1930-1939.
SONG Yubo, JIANG Zhaoyuan, SUN Bingzhen. Integrated Optimization of Operations in Multiple-I/O Points Automated Storage and Retrieval System[J]. Journal of Central South University(Science and Technology), 2016, 51(6):1930-1939.
[13]RAMTIN F, PAZOUR J A. Analytical Models for an Automated Storage and Retrieval System with Multiple In-the-aisle Pick Positions[J]. IIE Transactions, 2014, 46(9):968-986.
[14]ROSENBLATT M J, ROLL Y, ZYSER V. A Combined Optimization and Simulation Approach for Designing Automated Storage/Retrieval Systems[J]. IIE Transactions, 1993, 25(1):40-50.
[15]赵宁,董绍华,王国华.基于三阶段仿真法的AS/RS物流系统规划[J].北京科技大学学报, 2007, 29(10):1054-1059.
ZHAO Ning, DONG Shaohua, WANG Guohua. AS/RS Planning Based on Three-phase Simulation[J]. Journal of University of Science and Technology Beijing, 2007, 29(10):1054-1059.
[16]HAN M H , MCGINNIS L F , SHIEH J S , et al. On Sequencing Retrievals in an Automated Storage/Retrieval System[J]. IIE Transactions, 1987, 19(1):56-66.
[17]PETERS B A. Analysis of Dual-shuttle Automated Storage/Retrieval Systems[J]. Journal of Manufacturing Systems, 1994, 13(6):424-434.
[18]GUO J, ZHAO N, SUN L, et al. Modular Based Flexible Digital Twin for Factory Design[J]. Journal of Ambient Intelligence and Humanized Computing, 2019, 10(3):1189-1200.
[19]ZHAO N, LUO L, LODEWIJKS G. Scheduling Two Lifts on a Common Rail Considering Acceleration and Deceleration in a Shuttle Based Storage and Retrieval System[J]. Computers & Industrial Engineering, 2018, 124:48-57.
[20]ZHAO Ning, LUO Lei, ZHANG Saipeng, et al. An Efficient Simulation Model for Rack Design in Multi-elevator Shuttle-based Storage and Retrieval System[J]. Simulation Modelling Practice and Theory, 2016, 67:100-116.
[21]赵虎,赵宁,张赛朋.结合价值流程图与数字孪生技术的工厂设计[J]. 计算机集成制造系统, 2019,25(6):1481-1490.
ZHAO Hu, ZHAO Ning, ZHANG Saipeng. Factory Design Approach Based on Value Stream Mapping and Digital Twin[J]. Computer Integrated Manufacturing Systems, 2019, 25(6):1481-1490.
[22]赵宁,穆云,徐传标,等. 基于RESTART方法的同轨多天车仿真调度[J].系统工程理论与实践, 2016,36(7):1826-1836.
ZHAO Ning, MU Yun, XU Chuanbiao,et al. Multi-crane Scheduling Based on Repetitive Simulation Trials after Reaching Thresholds[J]. Systems Engineering-Theory & Practice, 2016, 36(7):1826-1836. |