[1]苏春, 胡照勇, 郑玉巧. 基于可用度约束的风力机单部件顺序维修优化[J]. 东南大学学报(自然科学版), 2019, 49(1):110-115.
SU Chun, HU Zhaoyong, ZHENG Yuqiao. Single Part Sequential Maintenance Optimization for Wind Turbines Based on Availability Constraint[J]. Journal of Southeast University (Natural Science Edition), 2019, 49(1):110-115.
[2]裴洪, 胡昌华, 司小胜, 等. 不完美维护下基于剩余寿命预测信息的设备维护决策模型[J]. 自动化学报, 2018, 44(4):719-729.
PEI Hong, HU Changhua, SI Xiaosheng, et al. Remaining Life Prediction Information-based Maintenance Decision Model for Equipment under Imperfect Maintenace[J]. Acta Automatica Sinica, 2018, 44(4):719-729.
[3]葛亚雄, 周晓军. 考虑修复非新的多组件DTS设备的状态维护建模[J]. 计算机集成制造系统, 2021, 27(3):739-746.
GE Yaxiong, ZHOU Xiaojun. Condition-based Imperfect Maintenance Modeling for Multi-component DTS Equipment[J]. Computer Integrated Manufacturing Systems, 2021, 27(3):739-746.
[4]郝虹斐, 郭伟, 桂林, 等. 非完美维修情境下的预防性维修多目标决策模型[J]. 上海交通大学学报, 2018, 52(5):518-524.
HAO Hongfei, GUO Wei, GUI Lin, et al. A Multi-objective Preventive Maintenance Decision-making Model for Imperfect Repair Process[J]. Journal of Shanghai Jiao Tong University, 2018, 52(5):518-524.
[5]MULLOR R, MULERO J, TROTTINI M. A Modelling Approach to Optimal Imperfect Maintenance of Repairable Equipment with Multiple Failure Modes[J]. Computers & Industrial Engineering, 2019, 128:24-31.
[6]MARTINOD R, BISTORIN O, CASTAEDA L, et al. Maintenance Policy Optimisation for Multi-component Systems Considering Degradation of Components and Imperfect Maintenance Actions[J]. Computers & Industrial Engineering, 2018, 124:100-112.
[7]ZHANG C, CHEN R T, WANG S P, et al. Resilience Efficiency Importance Measure for the Selection of a Component Maintenance Strategy to Improve System Performance Recovery[J]. Reliability Engineering & System Safety, 2022, 217:108070.
[8]王红, 熊律, 何勇, 等. 考虑故障风险的动车组部件机会维修优化策略[J]. 铁道学报, 2019, 41(3):79-85.
WANG Hong, XIONG Lü, HE Yong, et al. Optimization of Opportunistic Maintenance for Electric Multiple Unit Component Considering Failure Risk[J]. Journal of the China Railway Society, 2019, 41(3):79-85.
[9]熊律, 王红. 风险视角下的动车组部件多级非完美维修策略[J]. 中国机械工程, 2021, 32(4):399-406.
XIONG Lü, WANG Hong. Multi-level Imperfect Maintenance Strategy for EMU Components from Perspective of Failure Risks[J]. China Mechanical Engineering, 2021, 32(4):399-406.
[10]何勇, 王红, 李振华, 等. 考虑备件弹性订货的动车组部件分阶段维护决策[J]. 计算机集成制造系统, 2021, 27(6):1760-1767.
HE Yong, WANG Hong, LI Zhenhua, et al. Multi-phase Preventive Maintenance Decision for Single Component of Electric Multiple Unit Considering Flexible Ordering of Spare Parts[J]. Computer Integrated Manufacturing Systems, 2021, 27(6):1760-1767.
[11]杜煜, 李雨青, 张秀芳, 等. 考虑广义时间价值的串行退化生产系统维护更新策略[J]. 上海交通大学学报, 2020, 54(5):465-472.
DU Yu, LI Yuqing, ZHANG Xiufang, et al. Preventive Maintenance and Replacement Policy for Series Deteriorating Production System Considering Generalized Time Value[J]. Journal of Shanghai Jiao Tong University, 2020, 54(5):465-472.
[12]刘有为, 马麟, 吴立远, 等. 电力变压器经济寿命模型及应用实例[J]. 电网技术, 2012, 36(10):235-240.
LIU Youwei, MA Lin, WU Liyuan, et al. Economic Life Model of Power Transformer and Its Application[J]. Power System Technology, 2012, 36(10):235-240.
[13]周晓军, 沈炜冰, 奚立峰, 等. 一种考虑修复非新的多设备串行系统机会维护动态决策模型[J]. 上海交通大学学报, 2007, 41(5):769-773.
ZHOU Xiaojun, SHEN Weibing, XI Lifeng, et al. A Dynamic Opportunistic Preventive Maintenance Model for a Multi-unit Series System with Consideration of Imperfect Maintenance Effect[J]. Journal of Shanghai Jiao Tong University, 2007, 41(5):769-773.
[14]侯文瑞, 蒋祖华, 金玉兰. 基于可靠度的多部件系统机会维护模型[J]. 系统工程与电子技术, 2008, 30(9):1805-1808.
HOU Wenrui, JIANG Zuhua, JIN Yulan. Opportunistic Preventive Maintenance Model of Multi-components System Based on Reliability[J]. Systems Engineering and Electronics, 2008, 30(9):1805-1808.
|