[1]Joseph P B, Stan D. Mass Customization: the New Frontier in Business Competition[M]. Cambridge, Boston:the Harvard Business School Press, 1993.
[2]da Silveira G, Borenstein D, Fogliatto F S. Mass Customization:Literature Review and Research Directions[J]. International Journal of Production Economics, 2001,72 : 1-13.
[3]Zangiacomi A, Zhijian L, Sacco M, et al. Process Planning and Scheduling for Mass Customized Shoe Manufacturing[J]. International Journal of Computer Integrated Manufacturing, 2004,17 (7) : 613-621.
[4]Yao S,Han X,Yang Y,et al. Computer Aided Manufacturing Planning for Mass Customization [J].The International Journal of Advanced Manufacturing Technology, 2007,32 (1/2): 194-228.
[5]Partanen j, Haapasalo H. Fast Production for Order Fulfillment: Implementing Mass Customization in Electronics Industry [J]. International Journal of Production Economics,2004,90(2):213-222.
[6]祁国宁[1],杨青海[1].大批量定制生产模式综述[J].中国机械工程,2004,15(14):1240-1245.
[7]邵晓峰,黄培清,季建华.大规模定制生产模式的研究[J].工业工程与管理,2001,6(2):13-17.
[8]Guo Z X,Wong W K,Fan T. A Genetic--algorithm --based Optimization Model for Scheduling Flexi- ble Assembly Lines [J]. International Journal of Advanced Manufacturing Technology, 2008, 36 (1/2) : 156-168.
[9]Eksioglu B,Eksioglu S D,Jain P. A Tabu Search Algorithm for the Flowshop Scheduling Problem with Changing Neighborhoods[J]. Computers& Industrial Engineering, 2008,54 ( 1 ) : 1-11.
[10]Tavakkoli-- Moghaddam R, Khalili M, Naderi B. A Hybridization of Simulated Annealing and Electro- magnetic--like Mechanism for Job Shop Problems with Machine Availability and Sequence--dependent Setup Times to Minimize Total Weighted Tardiness[J]. Soft Computing, 2009, 13 (10).. 995- 1006.
[11]Silva C, Magalhaes J M. Heuristic Lot Size Scheduling on Unrelated Parallel Machines with Applications in the Textile Industry[J]. Computers & Industrial Engineering, 2006,50 ( 1/2): 76-89.
[12]Monch L,Driebel L. A Distributed Shifting Bottleneck Heuristic for Complex Job Shops[J]. Computer & Industrial Engineering, 2005,49 ( 3 ) : 363- 380.
[13]Dangayaeh G S, Deshmukh S G. Advanced Manufacturing Technology Implementation[J]. Journal of Manufacturing Teehnology Management, 2005, 16(5) :483-496.
[14]Moss H K, Yu W B. Toward the Estimation of Bottleneck Shiftiness in a Manufacturing Operation [J]. Production and Inventory Management Journal,2000,40(2) :53-58. |