[1]Koren Y, Heisel U,Jovane F, et al. Reeonfigurable Manufacturing Systems[J]. Annals of the CIRP, 1999,48(2) :527-540.
[2]武志军[1,2],宁汝新[1],王爱民[1].可重构制造系统布局规划方案的灰色模糊综合评价方法[J].中国机械工程,2007,18(19):2313-2318.
[3]Baykasoglu A, Dereli D, Sabuncu I. An Ant Colony Algorithm for Solving Budget Constrained and Unconstrained Dynamic Facility Layout Problems[J]. International Journal of Management Science, 2006, 34(4) :385-396.
[4]Baykasoglu A,Gindy N N Z. A Simulated Annealing Algorithm for Dynamic Layout Problem[J]. Computers & Operations Research,2001,28(14) .. 1403- 1426.
[5]Meng G, Heragu S S,Zijm H. Reconfigurable Layout Problem[J]. International Journal of Production Research, 2004,42 (22) : 4709-4729.
[6]梁福军[1],宁汝新[1].可重构制造系统中基于相似性理论的虚拟制造单元生成方法[J].计算机集成制造系统,2004,10(11):1370-1376.
[7]郭米娜.车间快速响应制造关键技术研究[D].国防科学技术大学,2005:
[8]吴畅.可添加/去除机器的动态布局优化研究[D].上海交通大学,2008:
[9]李树刚,吴智铭,庞小红.批量及路径可变时机器ROBUST布置问题[J].上海交通大学学报,2003,37(5):762-765.
[10]郭立夫.运筹学[M],2002.