[1]Naruse M, Off N. Hybrid Type Construction Machine: japan, 2004011502[P]. 2004-01-15.
[2]Naruse M,Tamaru M,Kimoto K. Hybrid Construc- tion Equipment: US, 2002/0125052 A1 [P]. 2002 - 09-12.
[3]松原守彦. Hybrid System of Construction Ma- chine : Japan, 2001173024[P]. 2001-06-26.
[4]Xiao Q,Wang Q F,Zhang Y T. Control Strategies of Power System in Hybrid Hydraulic Excavator[J]. Automation in Construction, 2008,17 (4) : 361-367.
[5]潘双夏[1],王冬云[1],李贵海[1].基于能量守恒和四线法的SOC估算策略研究[J].汽车工程,2007,29(5):415-419.
[6]王冬云[1],潘双夏[1],林潇[1],管成[1].并联混合动力挖掘机动力源匹配方法研究[J].浙江大学学报:工学版,2009(10):1783-1788.
[7]王冬云[1],潘双夏[1],林潇[1],管成[1].基于混合动力技术的液压挖掘机节能方案研究[J].计算机集成制造系统,2009,15(1):188-196.