[1]潘全科,朱剑英. 作业车间动态调度研究[J]. 南京航空航天大学学报,2005,37(2):262-268.
PAN Quanke, ZHU Jianying. Rolling Time Horizon Job-Shop Scheduling Strategy in Dynamic Environment[J]. Journal of Nanjing University of Aeronautics & Astronautics, 2005, 37(2): 262-268.
[2]ADIBI M A, ZANDIEH M, AMIRI M. Multi-objective Scheduling of Dynamic Job Shop Using Variable Neighborhood Search[J]. Expert Systems with Applications, 2010, 37(1):282-287.
[3]HE W, SUN D H. Scheduling Flexible Job Shop Problem Subject to Machine Breakdown with Route Changing and Right-shift Strategies[J]. Int. J. Adv. Manuf. Technol., 2013, 66 (1):501-514.
[4]FANG J, XI Y. A Rolling Horizon Job Shop Rescheduling Strategy in the Dynamic Environment[J]. Int. J. Adv. Manuf. Technol., 1997, 13(3): 227-232.
[5]LI J Q, PAN Q K, FATIH TASGETIREN M. A Discrete Artificial Bee Colony Algorithm for Multi-objective Flexible Job Shop Scheduling Problems with Maintenance Activities[J]. Applied Mathematical Modelling, 2014, 38: 1111-1132.
[6]FATTAHI P, FALLAHI A. Dynamic Scheduling in Flexible Job Shop Systems by Considering Simultaneously Efficiency and Stability[J] .CIRP Journal of Manufacturing Science and Technology, 2010, 2(2): 114-123.
[7]XIONG J, XING L N, CHEN Y W. Robust Scheduling for Multi-objective Flexible Job-shop Problems with Random Machine Breakdowns[J]. Int. J. Production Economics, 2013, 141: 112-126.
[8]AL-HINAI N, ELMEKKAWY T Y. Robust and Stable Flexible Job Shop Scheduling with Random Machine Breakdowns Using a Hybrid Genetic Algorithm[J]. Int. J. Production Economics, 2011, 132: 279-291.
[9]ZHANG L P, GAO L, LI X Y. A Hybrid Genetic Algorithm and Tabu Search for a Multi-objective Dynamic Job Shop Scheduling Problem[J].International Journal of Production Research,2013,51(12): 3516-3531.
[10]CHURCH L K, UZSOY R. Analysis of Periodic and Event-driven Rescheduling Policies in Dynamic Shops[J]. International Journal of Computer Integrated Manufacturing, 1992, 5(3): 153-163.
[11]张超勇,李新宇,王晓娟,等.基于滚动窗口的多目标动态调度优化研究[J].中国机械工程,2009, 20(18): 2190-2197.
ZHANG Chaoyong, LI Xinyu, WANG Xiaojuan, et al. Multi-objective Dynamic Scheduling Optimization Strategy Based on Rolling-horizon Procedure[J]. China Mechanical Engineering, 2009, 20(18): 2190-2197.
[12]张利平. 作业车间预反应式动态调度理论与方法研究[D].武汉:华中科技大学,2013.
ZHANG Liping. Research on Theories and Methods for Dynamic Job Shop Scheduling Based on Predictive-reactive Scheduling[D].Wuhan:Huazhong University of Science and Technology,2013.
[13]LI J Q, PAN Q K,SUGANTHAN P N, et al. A Hybrid Tabu Search Algorithm with an Efficient Neighborhood Structure for the Flexible Job Shop Scheduling Problem[J]. Int. J. Adv. Manuf. Technol., 2011, 52: 683-697.
[14]KARSITI M N, CRUZ J B, MULLIGAN J H. Simulation Studies of Mutilevel Dynamic Job Shop Scheduling Using Heuristic Dispatching Rules[J]. Journal of Manufacturing Systems, 1992,11(5):346-358.
[15]XUE F, SANDERSON A C, GRAVES R J. Pareto-based Multi-objective Differential Evolution[C]//Proceedings of the Congress on Evolutionary Computation. Washington D C, 2003: 862-869.
[16]YUAN Y, XU H. Flexible Job Shop Scheduling Using Hybrid Differential Algorithms[J]. Journal of Intelligent Manufacturing, 2007, 18(3):331-342.
[17]LI J Q, PAN Q K, LIANG Y C. An Effective Hybrid Tabu Search Algorithm for Multi-objective Flexible Job Shop Scheduling Problems[J]. Comput. Int. Eng., 2010, 59: 647-662.
[18]刘炜琪, 刘琼,张超勇,等. 基于混合粒子群算法求解多目标混流装配线排序[J]. 计算机集成制造系统, 2011, 17(12): 2590-2598.
LIU Weiqi, LIU Qiong, ZHANG Chaoyong, et al.Hybrid Particle Swarm Optimization for Multy-objective Sequencing Problem in Mixed Model Assembly Lines[J]. Computer Intergraded Manufacturing Systems, 2011, 17(12): 2590-2598.
[19]ZHANG G H, SHAO X Y, LI P G, et al. An Effective Hybrid Particle Swarm Optimization Algorithm for Multi-objective Flexible Job-shop Scheduling Problem[J]. Computers & Industrial Engineering, 2009, 56: 1309-1318.
[20]张超勇,董星,王晓娟,等. 基于改进非支配遗传算法的多目标柔性作业车间调度[J]. 机械工程学报,2010, 46(11):156-164.
ZHANG Chaoyong, DONG Xing, WANG Xiaojuan, et al. Improved NSGA-II for the Multi-objective Flexible Job Shop Scheduling Problem[J]. Journal of Mechanical Engineering, 2010, 46(11): 156-164. |