[1]GUNGOR A, GUPTA S M. Disassembly Line in Product Recovery[J]. International Journal of Production Research, 2002, 40(11): 2569-2589.
[2]AVIKAL S, MISHRA P K, JAIN R. A Fuzzy AHP and PROMETHEE Method-based Heuristic for Disassembly Line Balancing Problems[J]. International Journal of Production Research, 2014, 52(5): 1306-1317.
[3]ALTEKIN F T, AKKAN C. Task-failure-driven Rebalancing of Disassembly Lines[J]. International Journal of Production Research, 2012, 50(18): 4955-4976.
[4]McGOVERN S M, GUPTA S M. A Balancing Method and Genetic Algorithm for Disassembly Line Balancing [J]. European Journal of Operational Research, 2007, 179(3): 692-708.
[5]McGOVERN S M, GUPTA S M. Ant Colony Optimization for Disassembly Sequencing with Multiple Objectives[J]. The International Journal of Advanced Manufacturing Technology, 2006, 30(5/6): 481-496.
[6]McGOVERN S M, GUPTA S M. Combinatorial Optimization Analysis of the Unary NP-complete Disassembly Line Balancing Problem[J]. International Journal of Production Research, 2007, 45(18/19): 4485-4511.
[7]KALAYCI C B, GUPTA S M. A Hybrid Genetic Algorithm Approach for Disassembly Line Balancing [C]//Proceedings of the 42nd Annual Meeting of Decision Science Institute. Boston, 2011: 2142-2148.
[8]KALAYCI C B, GUPTA S M, NAKASHIMA K. A Simulated Annealing Algorithm for Balancing a Disassembly Line[C]//Proceedings of the Seventh International Symposium on Environmentally Conscious Design and Inverse Manufacturing. Kyoto, Japan, 2011: 713-718.
[9]KALAYCI C B, GUPTA S M. A Particle Swarm Optimization Algorithm for Solving Disassembly Line Balancing Problem[C]//Proceedings of Northeast Decision Sciences Institute 2012 Annual Conference. Newport, Rhode Island, USA, 2012: 347-357.
[10]KALAYCI C B, GUPTA S M. Artificial Bee Colony Algorithm for Solving Sequence-dependent Disassembly Line Balancing Problem[J]. Expert Systems with Applications, 2013, 40(18): 7231-7241.
[11]KALAYCI C B, POLAT O, GUPTA S M. A Variable Neighbourhood Search Algorithm for Disassembly Lines [J]. Journal of Manufacturing Technology Management, 2015, 26(2): 182-194.
[12]KALAYCI C B, GUPTA S M. Tabu Search for Disassembly Line Balancing with Multiple Objectives[C]//41st International Conference on Computers and Industrial Engineering. Los Angeles, 2011: 477-482.
[13]朱兴涛, 张则强, 朱勋梦, 等. 求解多目标拆卸线平衡问题的一种蚁群算法[J]. 中国机械工程, 2014, 25(8): 1075-1079.ZHU Xingtao, ZHANG Zeqaing, ZHU Xunmeng, et al. An Ant Colony Optimization Algorithm for Multi-objective Disassembly Line Balancing Problem [J]. China Mechanical Engineering, 2014, 25(8): 1075-1079.
[14]丁力平, 谭建荣, 冯毅雄, 等. 基于Pareto蚁群算法的拆卸线平衡多目标优化[J]. 计算机集成制造系统, 2009, 15(7): 1406-1413.DING Liping, TAN Jianrong, FENG Yixiong, et al. Multiobjective Optimization for Disassembly Line Balancing Based on Pareto Ant Colony Algorithm [J].Computer Integrated Manufacturing Systems, 2009, 15(7):1406-1413.
[15]CHENG C, LI H F, BAO C H. Hybrid Artificial Fish Algorithm to Solve TSP Problem[C]//Proceedings of the 6th International Asia Conference on Industrial Engineering and Management Innovation. Tianjin, 2016: 275-285.
[16]He Q, Hu X, Ren H, et al. A Novel Artificial Fish Swarm Algorithm for Solving Large-scale Reliability–redundancy Application Problem[J]. ISA Transactions, 2015, 59: 105-113.
[17]AZAD M A K, ROCHA A M A C, Fernandes E M G P. Solving Large 0-1 Multidimensional Knapsack Problems by a New Simplified Binary Artificial Fish Swarm Algorithm[J]. Journal of Mathematical Modelling and Algorithms in Operations Research, 2015, 14(3): 313-330.
[18]DEB K, PRATAP A, AGARWAL S, et al. A Fast and Elitist Multiobjective Genetic Algorithm: NSGA-II [J]. IEEE Transactions on Evolutionary Computation, 2002, 6(2): 182-197. |