[1]湖南省住房和城乡建设厅. 湖南省中低速磁浮交通工程质量验收标准:DBJ43/T201—2017[S]. 长沙:湖南磁浮交通发展股份有限公司,2018.
Hunan Provincial Department of Housing and Urban-Rural Development. Standard of Hunan for Project Quality Acceptance of Medium and Low Speed Maglev Transit:DBJ43/T201—2017[S]. Changsha:Hunan Maglev Transportation Development Co., Ltd.,2018.
[2]湖南省住房和城乡建设厅. 湖南省中低速磁浮交通设计标准:DBJ43/T007—2017[S]. 长沙:湖南磁浮交通发展股份有限公司,2018.
Hunan Provincial Department of Housing and Urban-Rural Development. Standard of Hunan for Design of Medium and Low Speed Maglev Transit:DBJ43/T007—2017[S]. Changsha:Hunan Maglev Transportation Development Co. Ltd. ,2018.
[3]胡立峰,应立军,吴志祥. 中低速磁悬浮列车轨道几何状态概述[J]. 企业家天地(理论版),2011(1):67-68.
HU Lifeng, YING Lijun, WU Zhixiang. An Overview of the Track Geometry of Medium-low Speed Maglev Train[J]. World of Entrepreneurs, 2011(1):67-68.
[4]郑文文. 中低速磁悬浮列车电磁悬浮系统分析[J]. 科技信息,2010(23):576-577.
ZHENG Wenwen. Research on Electromagnetic Suspension System of Mid-low Speed Maglev[J]. Vehicles Science & Technology Information,2010(23):576-577.
[5]LIANG Xiao, ZONG Bin. Influences of Track Random Irregularity on the Performance of Levitation Control System of Medium-speed Maglev Train[C]//IEEE Advanced Information Technology, Electronic and Automation Control Conference. Chongqing,2018:2381-0947.
[6]杨铭,林国斌,毕晟. 中低速磁浮轨道不平顺检测算法及其仿真计算[J]. 城市轨道交通研究,2018,21(12):101-105.
YANG Ming, LIN Guobin, BI Sheng. Detection Algorithm and Simulation of the Track Irregularity for Medium and Low-speed Maglev Train[J]. Urban Mass Transit,2018,21(12):101-105.
[7]殷勤. 中低速磁悬浮线路维护工程车的可行性分析及建议[J]. 铁道标准设计,2018,62(1):151-153.
YIN Qin, Feasibility Analysis and Suggestions on Maintenance of Medium and Low Speed Maglev Line[J]. Railway Standard Design, 2018,62(1):151-153.
[8]肖经洪. 基于弦测法的跨座式单轨轨道梁线形检测研究[D]. 重庆:重庆大学,2011.
XIAO Jinghong, Detect the Linear of Straddle Monorail Beam Based on Chord Measurement[D]. Chongqing:Chongqing University,2011.
[9]朱洪涛,魏晖,王志勇,等. 轨检仪弦测法“以小推大”检查轨道轨向不平顺的理论研究[J]. 铁道学报,2007,29(1):36-40.
ZHU Hongtao, WEI Hui, WANG Zhiyong,et al. Discussion on Inspection of Track Alignment Irregularities According to Method of Chord Measuring and Its “Using Small Fetch Big”[J]. Journal of the China Railway Society,2007,29(1):36-40. |