[1]吴积钦. 受电弓与接触网系统[M]. 成都:西南交通大学出版社,2010.
WU Jiqin. Pantograph and Contact Line System[M]. Chengdu: Southwest Jiaotong University Press, 2010.
[2]刘红娇,张卫华,梅桂明. 高速受电弓几何机构参数优化[J]. 铁道学报,2001,23(6):16-20.
LIU Hongjiao, ZHANG Weihua, MEI Guiming. Optimization of Geometric Parameters for High-speed Pantograph Mechanism[J]. Journal of the China railway Society, 2001, 23(6): 16-20.
[3]JIA F, XU F, ZHOU H, et al. Optimization and Simulation of the Operational Motion of a Pantograph: Uplift and Retraction[J]. Journal of Mechanical Science and Technology, 2017, 31(1): 41-52.
[4]张义民,高越,吕昊,等. DSA200受电弓可靠性及可靠性灵敏度分析[J]. 铁道工程学报,2016,33(9):99-103.
ZHANG Yimin, GAO Yue, LYU Hao, et al. Analysis of Reliability and Reliability Sensitivity of DSA200 Pantograph[J]. Journal of Railway Engineering Society, 2016, 33(9):99-103.
[5]王江文,梅桂明,李瑞平,等. 弓网相互作用时受电弓关键部件动载荷研究[J]. 铁道学报,2018,40(3):68-75.
WANG Jiangwen, MEI Guiming, LI Ruiping, et al. Dynamic Load Research of Key Components of Pantograph in Pantograph-catenary Interaction[J]. Journal of the China Railway Society, 2018,40(3): 68-75.
[6]LEE J, PARK T, OH H, et al. Analysis of Dynamic Interaction between Catenary and Pantograph with Experimental Verification and Performance Evaluation in New High-speed Line[J]. Vehicle System Dynamics, 2015, 53(8): 1117-1134.
[7]周宁,蔚超,邹欢,等.一种新的考虑接触角的弓网接触模型[J]. 振动与冲击,2019,38(2):265-270.
ZHOU Ning, YU Chao, ZOU Huan, et al. New Pantograph/Catenary Contact Model Considering the Influence of Contact Angle[J]. Journal of Vibration and Shock, 2019, 38(2): 265-270.
[8]KIM J W, Yu S N. Design Variable Optimization for Pantograph System of High-speed Train Using Robust Design Technique[J]. International Journal of Precision Engineering and Manufacturing, 2013, 14(2):267-273.
[9]姜静,刘志刚,宋洋. 考虑受电弓非线性的弓网动态特性仿真研究[J]. 计算机仿真,2015,32(2):170-174.
JIANG Jing, LIU Zhigang, SONG Yang. Simulation Study on Dynamic Behavior of Pantograph-catenary Considering the Nonlinear Characteristics of Pantograph[J]. Computer Simulation, 2015, 32(2): 170-174.
[10]SANCHEZREBOLLO C, JIMENEZOCTAVIO J R, CARNICERO A, et al. Active Control Strategy on a Catenary-pantograph Validated Model[J]. Vehicle System Dynamics, 2013, 51(4): 554-569.
[11]SONG Y, OUYANG H, LIU Z, et al. Active Control of Contact Force for High-speed Railway Pantograph-catenary Based on Multi-body Pantograph Model[J]. Mechanism and Machine Theory, 2017, 115(1): 35-59.
[12]PAPPALARDO C M, DE SIMONE M C , GUIDA D . Multibody Modeling and Nonlinear Control of the Pantograph/Catenary System[J]. Archive of Applied Mechanics, 2019, 89(8): 1589-1626.
[13]ZHANG J, LIU Z, SONG Y, et al. Study on Multidisciplinary Integrated Design of High-speed Pantograph Based on Parameters Design, Dynamics Analysis and Optimal Control[C]]//35th Chinese Control Conference. Chengdu, 2016: 10253-10257.
[14]罗钜,郭福水. 民用涡扇发动机总体多学科设计优化研究[J]. 中国机械工程,2019,30(15):1813-1820.
LUO Ju, GUO Fushui. Study on Multi-disciplinary Design Optimization on Civil Turbofan Engines[J]. China Mechanical Engineering, 2019,30(15): 1813-1820.
[15]KROO I, MANNING V. Collaborative Optimization: Status and Directions[C]]//8th Symposium on Multidisciplinary Analysis and Optimization. AIAA, 2000: 2000-4721.
[16]WANG W, LIANG Y, ZHANG W, et al. Effect of the Nonlinear Displacement-dependent Characteristics of a Hydraulic Damper on High-speed Rail Pantograph Dynamics[J]. Nonlinear Dynamics, 2019, 95(4): 3439-3464.
[17]PISANO A, USAI E. Contact Force Estimation and Regulation in Active Pantographs: an Algebraic Observability Approach[C]//46th IEEE Conference on Decision and Control. New Orleans: IEEE, 2007: 4341-4346. |