[1]杨延栋,陈馈,李凤远,等.盘形滚刀磨损预测模型[J].煤炭学报,2015,40(6):1290-1296.
YANG Yandong, CHEN Kui, LI Fengyuan, et al. Wear Prediction Model of Disc Cutter[J]. Journal of China Society,2015,40(6):1290-1296.
[2]赵海鸣,舒标,夏毅敏,等.基于磨料磨损的TBM滚刀磨损预测研究[J].铁道科学与工程学报,2014,11(4):152-158.
ZHAO Haiming, SHU Biao, XIA Yiming, et al. Study of Wear Prediction for TBM Cutter Based on Abrasive Wear Model[J]. Journal of Railway Science and Engineering, 2014,11(4):152-158.
[3]谭青,孙鑫健,夏毅敏,等.TBM盘形滚刀磨损预测模型[J].中南大学学报(自然科学版),2017,48(1):54-60.
TAN Qing, SUN Xinjian, XIA Yimin, et al. A Wear Prediction Model of Disc Cutter for TBM[J]. Journal of Central South University (Science and Technology), 2017,48(1):54-60.
[4]吴俊,袁大军,李兴高,等.盾构刀具磨损机理及预测分析[J].中国公路学报,2017,30(8):109-116.
WU Jun, YUAN Dajun, LI Xinggao, et al. Analysis on Wear Mechanism and Prediction of Shield Cutter[J]. Journal of Highway and Transport, 2017,30(8):109-116.
[5]柳培蕾,杨世强,白乐乐,等.基于磨料磨损的盘形滚刀刀圈磨损模型[J].中国机械工程,2019,30(15):1782-1789.
LIU Peilei, YANG Shiqiang, BAI Lele, et al. Wear Model of Disc Hob Cutter Rings Based on Abrasive Wear[J]. China Mechanical Engineering, 2019,30(15):1782-1789.
[6]杨延栋,陈馈,张兵,等.基于宏观能量理论与微观磨损机制的滚刀磨损量预测[J].隧道建设,2015,35(12):1356-1360.
YANG Yandong, CHEN Kui, ZHANG Bing, et al. Prediction of Disc Cutter Wearing Loss Based on Macro Energy Theory and Micro Wearing Mechanism[J]. Tunnel Construction, 2015,35(12):1356-1360.
[7]王立辉.全断面岩石掘进机刀具磨损状态的分析与识别[D].天津:天津大学,2012.
WANG Lihui. Analysis and Recognition of the Wear State of Full-face Rock Tunnel Boring Machine Disc Cutter[D]. Tianjin:Tianjin University, 2012.
[8]耿麒,魏正英,任军辉.基于能量法的TBM滚刀磨损机理分析研究[J].机械工程学报,2018,54(1):36-43.
GENG Qi, WEI Zhengying, REN Junhui. Analytical Research on the Wear Mechanism of TBM Disc Cutters Based on an Energy Approach[J]. Journal of Mechanical Engineering, 2018,54(1):36-43.
[9]夏毅敏,周明,毛晴松,等.不同岩石特性下TBM滚刀刀圈磨损性能[J].哈尔滨工程大学学报,2017,38(9):1456-1460.
XIA Yimin, ZHOU Ming, MAO Qingsong, et al. Wear Characteristics of TBM Disc-cutter Ring under Different Rock Characteristics[J]. Journal of Harbin Engineering University, 2017,38(9):1456-1460.
[10]王凯,陈馈,孙振川,等.基于复合磨蚀试验台的滚刀磨损试验研究[J].隧道建设,2018,38(1):142-147.
WANG Kai, CHEN Kui, SUN Zhenchuan, et al. Experimental Study of Disc Cutter Wear Based on Composite Abrasion Test Platform[J]. Tunnel Construction, 2018,38(1):142-147.
[11]孙振川,杨延栋,陈馈,等.引汉济渭岭南TBM工程二长花岗岩地层滚刀磨损研究[J].隧道建设,2017,37(9):1167-1172.
SUN Zhenchuan, YANG Yandong, CHEN Kui, et al.Study of Wear of Disc Cutter Boring in Monzonitic Granite Strata of Lingnan TBM Section of Hanjiang River-Weihe River Water Conveyance Project[J]. Tunnel Construction, 2017,37(9):1167-1172.
[12]张厚美.TBM盘形滚刀磨损与滚刀滑动距离关系研究[J].隧道建设,2017,37(3):369-374.
ZHANG Houmei. Research on Relationship between TBM Disc Cutter Abrasion and Disc Cutter Slipping Distance[J]. Tunnel Construction, 2017,37(3):369-374.
[13]张厚美.TBM盘形滚刀重复破碎与二次磨损规律研究[J].隧道建设,2016,36(2):131-136.
ZHANG Houmei. Study on Relationship between Repeated Cutting and Secondary Wear of TBM Disc Cutter[J]. Tunnel Construction, 2016,36(2):131-136.
[14]苏明,李彤,韩爱民,等.基于磨损比耗指数的滚刀磨损定量预测方法[J].隧道建设,2017,37(7):891-898.
SU Ming, LI Tong, HAN Aimin, et al.Quantitative Prediction Method for Disc Cutter Wear Based on Specific Wear Index(SWI)[J]. Tunnel Construction, 2017,37(7):891-898.
[15]闫长斌,樊明辉,陈馈,等.基于岩渣粒径分布规律的TBM刀具消耗分析[J].煤炭学报,2020,45(12):4216-4227.
YAN Changbin, FAN Minghui, CHEN Kui, et al. Analysis on TBM Cutter Consumption Based on the Particle Size Distribution of Rock Debris[J]. Journal of China Coal Society, 2020,45(12):4216-4227.
[16]WEST G. Rock Abrasiveness Testing for Tunneling[J]. International Journal of Rock Mechanics and Mining Sciences, 1989, 26(2):151-160.
[17]MORADIZADEH M, CHESHOMI A, GHAFOORI M, et al. Correlation of Equivalent Quartz Content, Slake Durability Index and IS50 with Cerchar Abrasiveness Index for Different Types of Rock[J]. International Journal of Rock Mechanics & Mining Sciences, 2016, 86:42-47.
[18]中国人民共和国住房和城乡建设部,中华人民共和国国家质量监督检验检疫总局.GB/T 50218—2014 工程岩体分级标准[S].北京:中国计划出版社,2014.
Ministry of Housing and Urban-Rural Development of the Peoples Republic of China, General Administration of Quality Supervision, Inspection and Quarantine of the Peoples Republic of China. GB/T 50218—2014 Standard for Engineering Classification of Rock Mass[S]. Beijing:China Planning Press, 2014.
[19]ALBER M , YARALI O , DAHL F , et al. ISRM Suggested Method for Determining the Abrasivity of Rock by the CERCHAR Abrasivity Test[J]. Rock Mechanics and Rock Engineering, 2014, 47:261-266.
[20]吴鑫林,张晓平,刘泉声,等.TBM岩体可掘性预测及其分级研究[J].岩土力学,2020,41(5):1721-1729.
WU Xinlin, ZHANG Xiaoping, LIU Quansheng, et al. The Prediction and Classification of Rock Mass Boreability in TBM Tunnel[J]. Rock and Soil Mechanics, 2020(5):1721-1729.
|