[1]李政阳, 云昕, 杨怡欣, 等. 在轨空间智能制造:分布式调度建模与优化[J]. 系统工程理论与实践, 2019,39(3):705-724.
LI Zhengyang, YUN Xin, YANG Yixin, et al. In-space Intelligent Manufacturing:Distributed Scheduling and Optimization[J]. Systems Engineering-Theory & Practice, 2019, 39(3):705-724.
[2]王凌, 邓瑾, 王圣尧. 分布式车间调度优化算法研究综述[J]. 控制与决策, 2016,31(1):1-11.
WANG Ling, DENG Jin,WANG Shengyao. Survey on Optimization Algorithms for Distributed Shop Scheduling[J]. Control and Decision, 2016,31(1):1-11.
[3]CHAOUCH I, DRISS O B, GHEDIRA K. A Novel Dynamic Assignment Rule for the Distributed Job Shop Scheduling Problem Using a Hybrid Ant-based Algorithm[J]. Applied intelligence, 2018,49(5):1903-1924.
[4]JIANG E, WANG L, PENG Z. Solving Energy-efficient Distributed Job Shop Scheduling via Multi-objective Evolutionary Algorithm with Decomposition[J]. Swarm and Evolutionary Computation, 2020,58:100745.
[5]瘙塁AHMAN M A. A Discrete Spotted Hyena Optimizer for Solving Distributed Job Shop Scheduling Problems[J]. Applied Soft Computing, 2021,106:107349.
[6]MENG L, ZHANG C, REN Y, et al. Mixed-integer Linear Programming and Constraint Programming Formulations for Solving Distributed Flexible Job Shop Scheduling Problem[J]. Computers & Industrial Engineering, 2020,142:106347.
[7]吴秀丽, 刘夏晶. 差分进化算法求解分布式柔性作业车间调度问题[J]. 计算机集成制造系统, 2019,25(10):2539-2558.
WU Xiuli, LIU Xiajing. Differential Evolution Algorithm for Solving Distributed Flexible Job Shop Scheduling Problem[J]. Computer Integrated Manufacturing Systems, 2019,25(10):2539-2558.
[8]LI J, DUAN P, CAO J, et al. A Hybrid Pareto-based Tabu Search for the Distributed Flexible Job Shop Scheduling Problem with E/T Criteria[J]. IEEE Access, 2018,6:58883-58897.
[9]王凌, 王晶晶. 考虑运输时间的分布式绿色柔性作业车间调度协同群智能优化[J]. 中国科学:技术科学, 2023,53(2):243-257.
WANG Ling, WANG Jingjing. A Cooperative Memetic Algorithm for the Distributed Green Flexible Job Shop with Transportation Time[J]. Scientia Sinica(Technologica), 2023,53(2):243-257.
[10]DU Y, LI J, LUO C, et al. A Hybrid Estimation of Distribution Algorithm for Distributed Flexible Job Shop Scheduling with Crane Transportations[J]. Swarm and Evolutionary Computation, 2021,62:100861.
[11]张洪亮, 徐公杰, 鲍蔷, 等. 考虑运输时间的分布式柔性作业车间绿色调度[J]. 中国机械工程, 2021,33(21):2554-2563.
ZHANG Hongliang, XU Gongjie, BAO Qiang, et al. Distributed Flexible Job Shop Green Scheduling with Transportation Time[J]. China Mechanical Engineering, 2021,33(21):2554-2563.
[12]XU W, HU Y, LUO W, et al. A Multi-objective Scheduling Method for Distributed and Flexible Job Shop Based on Hybrid Genetic Algorithm and Tabu Search Considering Operation Outsourcing and Carbon Emission[J]. Computers & Industrial Engineering, 2021,157:107318.
[13]LUO Q, DENG Q, GONG G, et al. An Efficient Memetic Algorithm for Distributed Flexible Job Shop Scheduling Problem with Transfers[J]. Expert Systems with Applications, 2020,160:113721.
[14]郭晨, 曾思豪, 郭钧, 等. 混合分布估计算法求解模糊分布式装配柔性车间调度问题[J]. 系统工程理论与实践, 2021,41(04):1037-1048.
GUO Chen, ZENG Sihao, GUO Jun, et al. Hybrid Estimation of Distribution Algorithm for Distributed Assembly Flexible Job Shop Scheduling Problem with Fuzzy Processing Time[J]. Systems Engineering-Theory & Practice, 2021, 41(4):1037-1048.
[15]TANG H, FANG B, LIU R, et al. A Hybrid Teaching and Learning-based Optimization Algorithm for Distributed Sand Casting Job-shop Schedu-ling Problem[J]. Applied Soft Computing, 2022,120:108694.
[16]SANG Y, TAN J. Intelligent Factory Many-objective Distributed Flexible Job Shop Collaborative Scheduling Method[J]. Computers & industrial Engineering, 2022,164:107884.
[17]桂林, 张春江, 李新宇. 具有工序顺序柔性的车间调度问题研究综述[J]. 工业工程, 2020,23(2):116-123.
GUI Lin, ZHANG Chunjiang, LI Xinyu. A Review of Research on Shop Scheduling Problem with Flexible Process Sequence[J]. Industrial Engineering Journal, 2020,23(2):116-123.
[18]高亮, 李新宇. 工艺规划与车间调度集成研究现状及进展[J]. 中国机械工程, 2011,22(8):1001-1007.
GAO Liang, LI Xinyu. Current Researches on Integrated Process Planning and Scheduling[J]. China Mechanical Engineering, 2011, 22(8):1001-1007.
[19]黄学文, 孙娜, 孙榕, 等. 工序顺序柔性描述模型研究[J]. 计算机集成制造系统, 2016,22(10):2275-2283.
HUANG Xuewen, SUN Na, SUN Rong, et al. Operation Sequence Flexibility Description Model[J]. Computer Integrated Manufacturing Systems,2016,22(10):2275-2283.
[20]钟宏扬, 刘建军, 韩省, 等. 集成零件外协与共享决策的柔性装配作业车间调度研究[J/OL]. 计算机集成制造系统:1-27.[2023-05-25].http:∥kns.cnki.net/kcms/detail/11.5946.TP.20220823.1541.017.html.
ZHONG Hongyang, LIU Jianjun, HAN Xing, et al. Integrating Part Outsourcing and Sharing Decision in Flexible Assembly Job Shop Scheduling[J/OL]. Computer Integrated Manufacturing Systems:1-27.[2023-05-25].http:∥kns.cnki.net/kcms/detail/11.5946.TP.20220823.1541.017.html.
[21]胡瑞淇, 程辉, 张执南. 基于表达式树的顺序柔性车间调度问题求解[J/OL]. 计算机集成制造系统:1-15[2023-05-25]. http:∥kns.cnki.net/kcms/detail/11.5946.tp.20220317.1506.002.html.
HU Ruiqi, CHENG Hui, ZHANG Zhinan. Solving Job Shop Scheduling Problem with Flexible Process Sequence Based on Expression Tree Model[J/OL]. Computer Integrated Manufacturing Systems:1-15[2023-05-25].http:∥kns.cnki.net/kcms/detail/11.5946.tp.20220317.1506.002.html.
[22]ZHANG S, LI X, ZHANG B, et al. Multi-objective Optimisation in Flexible Assembly Job Shop Scheduling Using a Distributed Ant Colony System[J]. European Journal of Operational Research, 2020,283(2):441-460.
[23]董海, 徐晓鹏. 离散回溯搜索算法求解多柔性作业车间调度[J]. 运筹与管理, 2022,31(1):87-91.
DONG Hai, XU Xiaopeng. Solving Multi-flexible Job-shop Scheduling Problem by Discrete Backtracking Search Algorithm[J]. Operations Research and Management Science, 2022,31(1):87-91.
[24]VITAL-SOTO A, BAKI M F, AZAB A. A Multi-objective Mathematical Model and Evolutionary Algorithm for the Dual-resource Flexible Job-shop Scheduling Problem with Sequencing Flexibility[J/OL]. Flexible Services and Manufacturing Journal:1-43.[2023-05-25].https:∥doi.org/10.1007/s10696-022-09446-x.
[25]GONG G, CHIONG R, DENG Q, et al. A Memetic Algorithm for Multi-objective Distributed Production Scheduling:Minimizing the Makespan and Total Energy Consumption[J]. Journal of Intelligent Manufacturing, 2020,31(6):1443-1466.
[26]李瑞, 王凌, 龚文引. 知识驱动的模因算法求解分布式绿色柔性调度[J]. 华中科技大学学报(自然科学版), 2022,50(6):55-60.
LI Rui, WANG Ling, GONG Wenyin. Knowledge-driven Memetic Algorithm for Distributed Green Flexible Job Shop Scheduling Problem[J]. Journal of Huazhong University of Science & Technology(Natural Science Edition), 2022,50(6):55-60.
[27]王圣尧, 王凌, 方晨, 等. 分布估计算法研究进展[J]. 控制与决策, 2012,27(7):961-966.
WANG Shengyao, WANG Ling, FANG Chen, et al. Advances in Estimation of Distribution Algorithms[J]. Control &Decision, 2012,27(7):961-966.
[28]张梓琪, 钱斌, 胡蓉, 等. 基于多维EDA算法的低碳分布式装配流水车间调度[J]. 控制与决策, 2022,37(5):1367-1377.
ZHANG Ziqi, QIAN Bin, HU Rong, et al. Multidimensional Estimation of Distribution Algorithm for Low Carbon Scheduling of Distributed Assembly Permutation Flow-shop[J]. Control & Decision, 2022, 37(5):1367-1377.
[29]王洪峰, 王娜, 汪定伟. 一种求解动态多峰优化问题的Memetic粒子群算法[J]. 系统工程理论与实践, 2013,33(6):1577-1586.
WANG Hongfeng, WANG Na, WANG Dingwei. A Memetic Particle Swarm Algorithm for Dynamic Multi-modal Optimization Problems[J]. Systems Engineering—Theory & Practice, 2013, 33(6):1577-1586.
[30]黄学文, 陈绍芬, 周阗玉, 等. 求解柔性作业车间调度问题的一种新邻域结构[J]. 系统工程理论与实践, 2021,41(9):2367-2378.
HUANG Xuewen, CHEN Shaofen, ZHOU Tianyu, et al. A New Neighborhood Structure for Solving the Flexible Job-shop Scheduling Problem[J]. Systems Engineering—Theory & Practice. 2021, 41(9):2367-2378.
[31]BALAS E. Machine Sequencing via Disjunctive Graphs:an Implicit Enumeration Algorithm[J]. Operations Research, 1969,17(6):941-957.
[32]DEB K, PRATAP A, AGARWAL S, et al. A Fast and Elitist Multiobjective Genetic Algorithm:NSGA-Ⅱ[J]. IEEE Transactions on Evolutionary Computation, 2002,6(2):182-197.
[33]BRANDIMARTE P. Routing and Scheduling in a Flexible Job Shop by Tabu Search[J]. Annals of Operations Research, 1993,41(3):157-183.
[34]LIN W, GOW H, TSAI M. An Efficient Hybrid Taguchi-immune Algorithm for the Unit Commitment Problem[J]. Expert Systems with Applications, 2011,38(11):13662-13669.
|